Five faults account for most failed barriers, and four of them cost less than the reinspection does. Here is what gets written up, and the rule each one breaks.
Last checked
Most barriers fail on a gate that does not self-latch, something climbable inside the
900 mm↗ zone, a gap under the fence wider than no more than 100 mm↗, a damaged panel, or a
missing resuscitation sign. Gates and climbable objects are the two that come up again and again.
An inspection is not an opinion. The inspector walks the fence line with a tape and a checklist, and writes down
what does not meet the numbers. That is good news: the same five things fail over and over, and most of them are a
Saturday morning of work.
The five faults in the list below, marked where an inspector finds them. Numbers match the list.
1. The gate does not latch by itself
This is the big one. A gate has to self-close and self-latch from any open position↗, which means from wide open and from a hand's width
away, every time, without a nudge. Springs tire. Posts move as the ground dries out and wets again, and a gate that
latched perfectly in March catches on the strike plate in September.
Check the rest of the gate while you are there. It must must not open towards the pool↗. The release handle has to sit
at least 1500 mm↗. Hinges need to be at least 900 mm apart↗, and a latch reachable from inside
the pool area needs a 450 mm-radius shield↗.
Gate faults are the most common reason a barrier fails. Figures are cited in the text and in Sources.
2. Something climbable is inside the zone
The zone is the point of the fence. Queensland requires 900 mm outside the fence↗ and
300 mm inside the fence↗, and the regulator's own list of offenders is domestic and familiar:
BBQs, furniture, pot plants, trees and garden beds↗.
The trap is that this one changes without you touching the fence. A shrub grows. A delivery of pavers gets stacked
by the gate. Someone drags the outdoor setting across for a birthday. Walk the fence line the week before the
inspector comes, not the morning of.
3. There is a gap under the fence
The maximum is no more than 100 mm↗ from finished ground level. Gaps open up on their own: mulch washes out
in a storm, a dog digs a run along the fence, turf shrinks back from a footing over a dry summer. Soil, a length of
timber or a mesh infill fixes it for very little.
The thresholds an inspector checks with a tape. Bar length is proportional to the figure shown.See this chart as a table
Rusted-through pickets, a cracked glass panel, a gate post you can rock with one hand. Glass has its own catch:
ledges on the outside face have to be 10 mm or less↗, and a panel showing any sign of fracture is
finished, not patchable.
If the barrier is a dividing fence shared with a neighbour, it still has to do the job: at the right height with
nothing climbable within 300 mm on the inside↗. That conversation is easier before the inspection than after it.
5. The resuscitation sign is missing or faded
In New South Wales the sign has to be readable from 3 m↗. It is the cheapest item on this page and one of
the most commonly written up, usually because the old one has been bleached illegible by a decade of sun.
What happens after a fail?
It depends where you are, and the difference is worth knowing before you book.
Victoria: you get 60 days↗ to put it right. An inspector must act
immediately↗ where the barrier cannot be fixed or clearly will not be in time, and
once a non-compliance certificate is issued the municipal building surveyor decides what happens next.
New South Wales: a certificate of non-compliance can still be attached to a contract of sale, and
the buyer then has 90 days from settlement↗ to fix the listed defects. It cannot be used to rent↗,
so a rental has to be made compliant first.
Queensland: councils are authorised to check compliance, and the regulator is blunt that it
can fine you↗ for an unregistered or non-compliant pool.
How to pass the first time
Book the inspection early, walk the fence line with the list above a week before, and test the gate the way a child
would: open it to every angle you can and let go. If it does not click shut on its own from every one of them, fix
that before anything else.
Reinspections cost money and time you may not have if a settlement date is moving towards you. What that looks like
in each state is in what a pool inspection costs, and the deadlines that apply
to your situation are in the compliance checker.